On the morning of July 9,2020,a test piling ceremony was held at Smart Power Distribution Industrial Base of Inhegrid Co., Ltd. in Zhuhai,China. With the success of the first pile,the project is formally into the construction stage and large-scale construction will soon be rolled out.
The construction of Smart Power Distribution Industrial Base is an important measure for INHEMETER to enter the field of smart power distribution,and is also one of the key representative projects of Zhuhai High-tech Zone in 2020.The base is located in the north of Zhuhai High-tech Zone,covering an area of around 17,001.65 square meters,with a building height of 25 meters and a building plot ratio of 2.5. The total capacity building area is 42,504.13 square meters and the total gross floor area is 44,965.19 square meters. After the completion of the project,it will play an important role in promoting the economic development of Zhuhai High-tech zone and provide strong support for the economic development of the zone in future.
Inhegrid Co., Ltd., as the wholly-owned subsidiaries of Inhemeter Co., Ltd,aims to provide professional services for global customers in the field of smart power distribution from high voltage to low voltage,transmission lines to distribution lines,substations to public users. Inhegrid is committed to developing flexible,high-quality solutions and a package of services to help smart power distribution companies modernize the grid and improve security,reliability,efficiency of grid and information management capabilities.