Self-Healing DA
Distribution networks are growing very fast and covering large scale in urban and rural area, pinpointing of fault in distribution network, providing isolation of faulty area to minimize the number of users that are impacted by the disturbance, clearing fault and restoration of network in minimum duration needs advance technology.
Self-Healing Distribution Automation Solution is a complete solution implemented on distribution power network, and includes medium/high voltage feeder, distribution substation and high voltage substation, the solution provides real time monitoring and intelligent control (monitoring critical parameters of distribution power network, locates and reports faults, automatically isolates faulty area, restores non-faulty area, provides remote control and reconfiguration, etc.).

RESULTS
Index
|
Normal time
|
After implementation of Self-healing DA
|
Average response time to pinpoint a fault / outage
|
2 hours
|
Less than 10 seconds
|
Average restoration of power network
|
2-3 hours
|
Less than 60 seconds
|
Average time spent on performing switching / isolation for planned outages
|
2-3 hours
|
1 to 4 minutes
|
Customer power cut due to outages
|
2 hour
|
Less than 20 seconds
|